Project description
Brief Description of the proposed application for the flooring product (this will be used as a description of the project within the final EPD)
Project type
Choose the appropriate product from the dropdown list.
Building Lifetime in years
The time the building as a whole is being designed to last.
Flooring replacement interval in years
The period before the floorcovering is replaced. This figure is dependent on a wide range of factors including the area of use, the amount of wear and the need to change the floorings for reasons other than the flooring coming to the end of its life. These may include change of use or fashion. It should consider the manufacturers recommendation for the individual application under consideration.
Number of Replacements


GENERATE ENVIRONMENTAL PRODUCT DECLARATION ACCESS HTML REPORT
The number of times the floor will have to be manufactured, installed, removed and disposed of over the life of the building, including the initial installation.


Loading...