General requirements

Inspecting the goods before laying, check all flooring in natural daylight for visible faults. Goods with obvious visible defects already shown before installation should not be used. Floors that have already been installed will not be exchanged.

Storage and acclimatisation. Leave the floor covering to acclimatise in the same environmental conditions as the installation area for a period of at least 24 hours prior to installation and at approx 15-25°C and maximum 65 % relative humidity.

When the floor should be glue down the gluing of the floor covering is always carried out on a full surface with a recommended and approved adhesive. The application instructions of the adhesive manufacturer must be observed.